FAQ's

What criteria should I use when choosing a pool builder?
The best source of information will be people who have used the builder for their own pool. We will provide you with a list of referrals, call the customers on the list and ask about their experience. Visit pools built by the builder to get a first hand feel for the quality of builder. Not all builders are the same. Many cut corners on stone work so they can move on to the next pool. Look at examples of work. You may also wish to check with Better Business Bureau to see if there have been complaints against the builder, and if so did they respond and rectify the problem?

Does My Pool Come With a Warranty?
Yes, all our pools come with a lifetime structural warranty. We will provide you with the details of what is covered in writing.

Customer Service
At True Blue Pools we want to make sure you understand how to operate your pool. We will show you how to operate all equipment and gladly answer any questions you may have. We are only a phone call or email away if you need any clarification or help of any kind.

The Process

The Design Phase

This is the first step in the building of a swimming pool and the associated landscaping. We will prepare a design specifically for you. We take many things in to consideration at this phase... The property layout, the house style, your wants/desires, the family unit, and budget considerations.

Permits Phase

We construct detailed drawings and provide all necessary engineering for the city/county. The city/county process can be a one day to two week process depending on the particular location.

Layout/Excavation Phase

We form the pool with wood forms using the detailed plans that we made for the permit phase. We then use tractors to excavate the swimming pool and dump trucks to take the dirt to a legal dump site

Steel Reinforcement Phase

We place the rebar according to the engineering that is called for in the particular design we are working with.

Rough Plumbing Phase

We place pipe for the water and the electrical to the pool. We pressurize the system. We call for inspection for the steel, bonding, and underground.

Shot-crete Phase

We are now ready to apply the shell of the pool. Shot-crete is applied by high pressure air to the steel reinforcement. This is one of the more interesting things to watch in the pool building process.

Curing Phase

The shot-crete is allowed to cure for seven to ten days. During this phase water is applied to the shell a couple of times per day to slow down the cure. This makes the shell stronger. We typically take advantage of this cure time by using it to make stone, concrete, tile, and boulder selection.

Coping Phase

After the shell has cured sufficiently we start installing the coping, tile, and any water-features that might be included in you design.

Equipment Set Phase

During this phase we install all of the pool equipment including: pumps, filters, lighting, salt systems, electronics, and heaters. Once these are installed we call for a Pre-plaster inspection.

Plaster Phase

Once we have the okay from the city/county we apply the plaster, hydrazzo, or pebble finish. Water is placed in the pool immediately. Time to start enjoying your swimming pool.

Swimming pool contractor san diego

 

     

pool building phases

 

 

Swimming Pool Information Pages

Vanishing Edge Swimming Pools

Salt Swimming Pools

Swimming Pool Automation

Swimming Pool Coping Choices

Swimming Pool Remodels

Swimming Pool Grottos and Caves

Shotcrete versus Gunite?

 



swimming pool building process
Association of Pool & Spa Professionals
swimming pool phases
Member of the San Diego and Orange County Better Business Bureau
760.730.3399 or 949.219.9910
Contractor License # 834998   sales@poolsbytrueblue.com


Home  |  Photo Gallery: Pools  |  Photo Gallery: Hardscape  |  Company  |  Contacts  |  FAQ  |  SiteMap  |  Privacy  | 

swimming pools, vanishing edge, negative edge, zero edge, waterfalls, waterfeature, fountains, landscape, hardscape, design, fireplaces, firepits, walls, concrete, flagstone, stackstone, masonry, Del Mar, Carlsbad, Oceanside, Encinitas, Rancho Sante Fe, La Jolla, San Diego, North County, shot-crete, contractor, remodel, plaster, pebble, spas, jacuzzis
pool building process, pool building phases, swimming pool building steps, process of building swimming pools, how to build a swimming pool, San Diego and Orange County pool building process, pool building phases, swimming pool building steps, process of building swimming pools, how to build a swimming pool, San Diego and Orange County pool building process, pool building phases, swimming pool building steps, process of building swimming pools, how to build a swimming pool, San Diego and Orange County pool building process, pool building phases, swimming pool building steps, process of building swimming pools, how to build a swimming pool, San Diego and Orange County

© True Blue Pools.   All Rights Reserved.   Website by Butch